Manycon is the best recommended integrity testing team in Saudi. It is simply a way to measure the leakage of an enclosure. A large fan is temporarily installed in the doorway of the room to be tested, with the fan blowing into the room (pressurizing the room). The fan speed is adjusted to obtain flow pressure equivalent to the pressure exerted during a fire suppression system discharge. The fan is then reversed on the door to draw air from the room (depressurizing the room). The airflow and pressure readings obtained are entered into a computer program designed to calculate the equivalent leakage area (ELA) for the room. When a room has a suspended (drop) ceiling, then the below ceiling leakage area (BCLA) is calculated as one-half the total ELA and is used in the calculations for retention time. Given that most gaseous chemical agents used for fire suppression are heavier than air, the agent will begin to leak out of any lower level penetrations left unsealed.
Manycon begins by reviewing the specifications and requirements of the room to be tested. This includes understanding the purpose of the room, its design specifications, and any relevant industry standards or regulations.
Based on the initial assessment, Manycon develops a comprehensive test plan. This plan outlines the testing procedures, equipment requirements, acceptance criteria, and schedule for the room integrity test.
Manycon coordinates with the client to ensure that the room is prepared for testing. This involves sealing all openings, such as doors, windows, vents, and ducts, to create a sealed enclosure.
Manycon brings in specialized equipment for the room integrity test. This typically includes calibrated fans or blowers, pressure gauges, airflow measurement devices, and any other necessary instruments.
Manycon pressurizes the room using a non-hazardous gas, such as nitrogen or clean dry air, to a specified pressure level. The calibrated fans or blowers are then used to measure the rate of pressure decay over time.
Throughout the test, Manycon collects data on pressure differentials, airflow rates, temperature, humidity, and other relevant parameters using the specialized equipment.
Once the test is complete, Manycon analyzes the data collected during the test. This analysis involves comparing the measured values against the specified acceptance criteria and industry standards.
Manycon prepares a detailed report documenting the test procedures, results, analysis, and findings. This report includes any deviations from acceptance criteria, identified deficiencies, and recommendations for corrective actions.
Based on the test results and analysis, Manycon issues a certification or compliance statement indicating the outcome of the room integrity test. This certification confirms the room's suitability for its intended purpose.
If any deficiencies are identified during the test, Manycon provides recommendations for corrective actions. This may include repairs, modifications, or retesting as needed to ensure the integrity of the room.
These factors combined contribute to the decline in fire usage in Saudi, promoting safety, sustainability, and modernization.
Manycon Room Integrity Test would offer comprehensive testing services to assess the integrity of sealed enclosures. This includes pressurization testing, airflow measurement, and analysis of pressure differentials to ensure that the room meets specified environmental standards.
As a leading specialist, Manycon Room Integrity Test would have a team of experienced technicians with expertise in room integrity testing. They would be knowledgeable about industry standards, regulatory requirements, and best practices for testing and certification.
Manycon Room Integrity Test would use state-of-the-art equipment and instrumentation for conducting tests with precision and accuracy. This includes calibrated fans, pressure gauges, airflow meters, and data logging devices.
They might offer customized testing solutions tailored to the specific needs of clients and their facilities. This could include developing testing protocols, providing training for staff, and offering consulting services for optimizing room performance.
Manycon Room Integrity Test would ensure that their testing procedures comply with relevant industry standards and regulations. They would provide certification and documentation to validate the integrity of tested rooms and demonstrate compliance with regulatory requirements.
Customer satisfaction would be a priority for Manycon Room Integrity Test. They would strive to deliver reliable, accurate, and timely testing services while maintaining professional communication and collaboration with clients.
The primary purpose of room integrity testing is to verify that the enclosure can maintain its intended environmental conditions, which are critical for the processes or equipment housed within it. This is particularly important in environments where precision control is necessary, such as pharmaceutical manufacturing, data centers, or sensitive research facilities.
Room integrity testing typically involves pressurizing the room with a non-hazardous gas, such as nitrogen or clean dry air, to a specified pressure level. A calibrated fan or blower is then used to measure the rate at which the pressure decays over time. By analyzing the rate of pressure decay, technicians can assess the overall integrity of the room's envelope, including doors, windows, walls, ceilings, and penetrations.
The acceptance criteria for room integrity testing are usually based on industry standards and regulatory requirements specific to the type of facility and its intended use. Common standards include ISO 14644 for cleanrooms and data center industry guidelines such as ASHRAE TC 9.9. These standards define permissible levels of pressure loss and leakage rates based on the class or rating of the room.
Upon completion of the testing, a detailed report is typically generated, documenting the test methodology, equipment used, measured pressure decay rates, and compliance with acceptance criteria. Any areas of concern or deficiencies identified during the testing may also be noted, along with recommendations for corrective actions if necessary.
Room integrity testing is typically conducted initially after construction or renovation of the facility to verify compliance with design specifications. Subsequent testing may be performed periodically as part of ongoing maintenance and validation activities to ensure continued integrity and compliance with regulatory requirements.
Ensuring the integrity of the room environment is critical for maintaining product quality, data security, and safety. Inadequate room integrity can lead to contamination, equipment malfunction, data loss, or other adverse effects, potentially resulting in costly downtime, product recalls, or regulatory violations.
A room with proper room integrity is vital to ensuring that fires are contained, and damage is minimised. These systems can help prevent the spread of fire, smoke and toxic gases to other parts of the building. If not properly secured, smoke and fire can result in extensive damage and loss of life. Room integrity testing is also crucial for reducing the impact of fire on critical infrastructure and preserving sensitive information. By conducting room integrity tests, building owners can reduce the risk of damage to equipment, facilities and sensitive information.
The means to test the room for ‘ tightness ‘ is by the Retrotec Room Integrity Door Fan Pressure Test means. A calibrated and certified axial flow fan is latched into rigid expandable panels that fill the opened door frame space.By running the calibrated fan at a certain speed thus generating pressure into / from the space, and by monitoring the pressure differential within and external to the room, that flow rate is actually measured, data inputted to software together with the protected height and the weight of gas ( FM200 / FE25 / Novec 1230 or Proinert / Argonite / Inergen Inert Gas, yes inert gas is basically air, but it still has weight!) and a descending interface height hold time, or mixing concentration result is obtained.The performance of any fire suppression system can only be guaranteed when serviced regularly through a professional maintenance solution. We always recommend that room integrity testing should be part of an annual service and maintenance package, to ensure that on discharge, the suppression agent achieves and maintains the correct concentration, at the appropriate height for minimum required timeframe.Most rooms housing mission critical equipment are constructed with the perimeter walls extending from “slab to slab” in a manner that creates a fire rated barrier around the room. Because of their construction, these rooms will have fewer leaks and have a much greater chance of passing a standard Room Integrity Fan Test. However, it is possible to achieve a successful test in a room where the perimeter walls do not extend from “slab to slab” but instead extend only to above the suspended ceiling. When preparing a room to retain a gaseous fire suppression agent, the walls and slab must be inspected for penetrations and leakage points. All areas of concern must be properly sealed with fire retardant materials and doors fitted with pressure seals around the jams and threshold.
Room integrity tests should be conducted immediately after a gaseous fire suppression system has been installed, and routinely every year thereafter to validate the integrity of a protected area.
Over time the characteristics in a room may change, which results in new leakages and affects the retention time within an enclosure. Any alterations made to the structural perimeter of an enclosure, such as holes, cracks, cable entry points, electrical conduit points, and any other voids will require retesting of the room to ensure that all leakage points are adequately sealed.
For accurate readings and minimal interference, all air conditioning units and HVAC systems passing into the enclosure would need to be shut down or temporarily sealed during testing. Air conditioning units introduce a new air supply into the enclosure which disrupts the testing process.
A typical room integrity test procedure consists of two parts, the Door fan test and the computer calculation.
DOOR FAN TEST:
The first part of a room integrity test involves the use of a fan mounted into a door panel to introduce a flow of air into the room. The fan blows air into a protected enclosure to create positive pressures that simulates the pressures exerted during a fire suppression system discharge.
The fan is then reversed to draw air from the room, creating a depressurised condition within the enclosure. Pressure and air flow rate readings are taken for both the positive and negative pressure tests.
COMPUTER CALCULATION:
The second part of a room integrity test involves inputting the pressure test readings into a computer, along with the details of the fire suppression system and the dimensions of the protected enclosure.
Specialised computer software then calculates the predicted Equivalent Leakage Area for the enclosure, as well as the room’s gas retention time. If the retention time is above 10 minutes, the room passes the integrity test. In instances where the retention time is below 10 minutes, the room fails the integrity test and identified leakages would need to be permanently sealed.
Once a test has been completed, a full room integrity test report should be produced detailing the date the test was conducted, identified leakage areas, pressurisation results, predicted retention times, and all other relevant information.
Accuracy and Precision: The testing methods used should be accurate and precise in measuring pressure differentials, airflow rates, and other relevant parameters. High-quality equipment and calibrated instruments contribute to the accuracy of the testing process.
The testing team should have expertise and experience in conducting room integrity tests. Knowledge of industry standards, regulatory requirements, and best practices ensures that tests are performed correctly and results are interpreted accurately.
Efficient testing procedures help streamline the testing process and minimize downtime for the facility being tested. This includes proper preparation of the room, effective use of equipment, and standardized testing protocols.
Clear communication between the testing team and the client is essential for efficient room integrity testing. This includes discussing testing objectives, scheduling, and any special requirements or considerations for the facility being tested.
Timely reporting and documentation of test results are critical for efficiency. Clients should receive detailed reports promptly after testing, including any findings, recommendations, or follow-up actions required.
Efficient room integrity testing involves ensuring compliance with relevant industry standards and regulatory requirements. Certification and documentation provided by the testing team should demonstrate compliance and facilitate regulatory approvals if necessary.
Room integrity testing should be cost-effective for clients while still maintaining high quality and accuracy. This may involve offering competitive pricing, optimizing testing procedures to minimize resource consumption, and providing value-added services to clients.
The room under test should be completely isolated from the adjacent rooms.
The Room’s Complete Fire Suppression System Design detail must be shared with the Tester.
All visible potential openings, holes which can enable leakage are sealed permanently.
The Door dimensions of the Room under test shall be made available.
The Pipe Shop Layout Drawing should be made available to the Tester.
AHU / AC should be shut down during Testing, the Shutdown Scheduling and approval from concerned authorities should be obtained in advance.
The Authorized Witness from the Client should be nominated.
15 Amp RAW Power Supply must be made available near to the Room.
Any Safety Requirements / Company Policies and any other Specific requirements of the Site Owner should be notified to the Tester. After Addressing all the perquisites and Tester studies the input details, and may suggest any specific requirements that needs to be addressed prior testing